Skip to content.
Sections
Home About Us Consumer Industry Contact Vacancies
Document Actions

Wind Integration Project (WIP)

Introduction

The Wind Generation Integration Project (WGIP) made a number of recommendations to integrate wind generation into New Zealand’s power system, particularly in relation to the provision of accurate pre-dispatch information and the ability of the power system to handle large scale unpredicted changes in wind generation.  The Commission has established the Wind Integration Project (WIP) to develop appropriate arrangements

Project Plan

The Board approved the Wind Integration Project Plan pdf [476 KB] at its meeting on 23/24 September 2008.

Wind Energy Conference 2009

The Commission gave a presentation pdf [188 KB] on the Wind Integration Project to the New Zealand Wind Energy Association's 2009 Conference.

The Commission also made 2 other presentations to the Conference, details can be found on:

 

Further information about the earlier wind projects (the Tactical Wind Project and the Wind Generation Investigation Project) can be found on the Wind Generation Projects page.

Last update on 29 April 2009 03:14 PM